Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 8894

Long text overwriting the existing text in KP06, KPF6 and GP12N

$
0
0

Hi Experts,

 

I have been posting plan values manually against the cost objects and have been adding long text against a certain period (EX: period 10). Problem is that this text is being posted against all the 12 periods.

 

If I post a plan value against a particular period with long text, this text is overwriting the existing long text for all the 12 periods.

 

Could anyone help me with the issue...if any settings need to be changed???

 

Thanks in advance



Viewing all articles
Browse latest Browse all 8894

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>