Hi,
I have the following requirement.
Scenario: I have a material which can be produced on multiple resources in a plant, these resources are shared by multiple products as well. For a particular material multiple resources will have same throughput and same production cost. based on cost optimization if optimizer loads a material on a resource it should not change the resource in subsequent buckets.
Issue: if for a material "material1" optimizer chooses resource RES1 it should continue to load the RES1 in the subsequent buckets, it should not change the resource for "material1".
We tried to include the setup in the SNP optimizer run, however for a plant there are very high number of products sharing multiple lines which increases the optimizer run time.
Request you to please share your suggestions to solve this issue.
Thanks in advance for your help,